Zanar Blouse Rust
€105,57
Dołącz do listy oczekujących
Poinformujemy Cię, gdy produkt pojawi się w magazynie. Podaj poniżej swój poprawny adres e-mail.
Free shipping from 135 EUR
Gia is 178 cm tall and is wearing size S.

Cecha 1

Cecha 2

Cecha 3

Cecha 4
PRE-ORDER. Shipping after October 14
The Zanar Blouse is the epitome of comfort and style. The oversized fit along with wide, kimono style sleeves give this blouse a unique look. The deep V- Neckline highlights the chest and neck adding a sense of timeless elegance. The minimalist yet characteristic look of the Zanar blouse will be perfect for any look, both casual and elegant. It will be a staple in your closet.
– V-neckline
– wide kimono style sleeves
– delicate slits at the sides
– made in Poland
– wide kimono style sleeves
– delicate slits at the sides
– made in Poland
63% lyocell 35% viscose 2% elastane
A- Bust Circumference | B- Bottom Circuit | C- Sleeve Length | D- Total length | |
OS | 41 cm | 41 cm | 65 cm | 54 cm |
- granica błędu +/- 1cm
- mierzone na płasko
DPD courier service– 19 zł
Servicio de mensajería InPost – 18 zł
InPost parcel lockers – 16 zł
(The order fulfilment time in the Republic of Poland is up to 7 business days)
Courier delivery within the European Union – 15 EUR
(The order fulfilment time in the European Union is up to 14 business days)
Shipping to the United States and Canada– 30$
(The order fulfilment time in North America is up to 21 business days)
International courier service– 55$
(The order fulfilment time in other countries up to 30 business days)
Servicio de mensajería InPost – 18 zł
InPost parcel lockers – 16 zł
(The order fulfilment time in the Republic of Poland is up to 7 business days)
Courier delivery within the European Union – 15 EUR
(The order fulfilment time in the European Union is up to 14 business days)
Shipping to the United States and Canada– 30$
(The order fulfilment time in North America is up to 21 business days)
International courier service– 55$
(The order fulfilment time in other countries up to 30 business days)
MADE BY
Construction made by:

Prototype cut by:

Prototype sewn by:

Production cut by:

Production supervised by:

Production descended:

Ironed by:


Quality control:

Packed by:
